Skip to main content
A distribution centre supervisor checking the time before an early shift.

Using ShiftAlert

Choose when the two phone checks should happen.

Work backwards from the shift start. The right timing depends on travel, preparation, retries and what a manager can still do with a missing response.

Read the guide

A pair such as 90 and 60 minutes describes when each check begins before the shift. It does not guarantee when a response or escalation will be recorded. Build the timing around the operation, then review the history after people have used it.

The essentials, at a glance.

  • The first check should leave enough time for preparation or a contingency decision.
  • The second check should still leave enough time to travel and arrive with the chosen margin.
  • Attempts take time. The configured offset is the start of a check, not a guaranteed escalation minute.

01 · Start with the operation

Work backwards from the scheduled start.

For the second check, add the expected travel time, an arrival or handover margin, and a realistic allowance for the check to complete. A one-hour journey and a second check that begins exactly 60 minutes before the shift leave no travel margin if the worker waits for that response before setting off.

For the first check, add the time needed to complete that check, prepare for departure and reach the second-check point. Also ask what a manager could do after a failed first check. If arranging cover takes longer than worker preparation, the contingency window should drive the earlier setting.

TraceRoute uses 90 and 60 minutes.

The project owner reports that TraceRoute uses checks 90 and 60 minutes before monitored departures, with travel of about an hour. That arrangement creates a second response point near the expected time to set off. Pressing 1 confirms the phone check; it does not verify that the driver has started travelling.

02 · Allow for attempts

A check can take longer than one call.

ShiftAlert can make more than one attempt within each check. A retry is scheduled after the previous attempt completes, so call duration, the retry interval and queue processing all affect when a check finishes. Do not subtract only the nominal call time when deciding how much room the manager has.

Use a planning allowance based on your observed history rather than treating it as a service guarantee. More attempts may improve reachability, but they also move a possible manager escalation later. Review timing and attempt count together.

03 · Compare examples

The same offsets do not fit every journey.

For a nearby site, a 60/30 plan may work if preparation takes 15 minutes, travel takes 15 minutes, and the team allows five minutes for the second check plus five minutes at the site. Under those assumptions, the later window still has a small margin.

For a one-hour journey, a 120/90 illustration can allow ten minutes for each check, twenty minutes of preparation between them and ten minutes of arrival margin. These are examples for discussion, not recommended defaults. The current call timings apply at company level, so a mixed workforce needs a plan that also handles the longest relevant journey.

04 · Review the result

Use history to improve the plan carefully.

After changing the settings, inspect upcoming shifts and keep a note of the change date. Past call history is not rewritten. The Settings counters cover a rolling period, so they do not reset when you save new values and cannot by themselves prove that the new timing caused an improvement.

Look at individual check histories, later-stage confirmations and manager calls. A rise in later responses may mean the first check is inconvenient, contact details are poor or the selected shifts differ. Ask before drawing a conclusion, and keep actual attendance separate from phone confirmation.

Put it into practice

Choose timings from explicit assumptions.

  • Travel, preparation and arrival margin have been written down.
  • The allowance for multiple attempts is included.
  • The first check leaves time for the manager’s realistic contingency action.
  • Workers understand the purpose of both phone checks.
  • Results will be reviewed without treating confirmation as attendance.
See how it works
Back to the blog

Start with one critical shift

Give every minute a clear purpose.

Talk through the critical shifts your team needs to follow up before they start.