Start with the smallest useful scope: one department, a few future shifts and people whose records you can verify. Preview or map the data, run the appropriate import path and inspect both the job history and the resulting Alerts before expanding.
The essentials, at a glance.
- CSV preview, Planday pull and Custom API push are different workflows.
- Stable source identity matters when later data should update existing records.
- Imported does not automatically mean every shift is protected and ready.
01 · Choose the path
Match the source to the way updates arrive.
Use CSV when a team can export a controlled file and review it before processing. Planday uses a configured connection, refreshed source values, saved mappings and a pull sync. Custom API is a push integration: the external system sends changes to ShiftAlert.
The Alerts Sync action cannot pull new Custom API data. “Connected” means credentials were accepted; it does not prove that departments, workers, managers or shift types are mapped as intended.
02 · Prepare mapping
Keep identity and responsibility stable.
Map source departments to the correct ShiftAlert departments and managers. Use stable external identifiers or the supported matching fields so the next update can be recognised. Do not assume that matching by a similar name or phone will prevent every duplicate across manual, recurring and connected sources.
For Planday, refresh the available source departments and shift types before mapping new values. Saving the mapping stores configuration; it does not run synchronization. For CSV, review the preview and correct validation issues before processing.
03 · Read the job
Use import history as an audit trail.
Inspect counts such as added, updated, unchanged, skipped or failed, then open warnings instead of relying on a green connection state. A successful job can still contain rows that did not become usable critical shifts.
Do not claim that re-uploading a CSV deletes every absent row. Deletion behaviour depends on the source workflow and matching rules. Contacted shifts may be intentionally protected from later import updates so their history remains coherent.
04 · Verify Alerts
Check the operational result after the data move.
Open important future shifts in Alerts. Verify date and time, source, department, worker, responsible manager and protection state. Check that the manager can view the department and has a reachable phone before the call window begins.
When a repeated error appears, correct the owning source: the CSV preparation, recurring rule, Planday mapping or external API payload. Fixing only the visible row may allow the next synchronization to recreate the problem.
Put it into practice
Treat import as a controlled data path.
- The source is correctly identified as CSV, pull or push.
- Departments, workers and managers are mapped deliberately.
- Stable identifiers and matching rules are understood.
- Job counts and warnings have been reviewed.
- A sample of important future Alerts is operationally correct.



