Operational impact

Understand the cost of a missed shift.

The cost can extend beyond the empty position. Separate the extra expense you can measure from disruption you can describe but cannot yet price.

Read the guide

A missed start may mean overtime, a delayed departure or a manager leaving another task to arrange cover. Putting every possible consequence into one impressive number is not useful. A modest estimate with clear assumptions is a better basis for a decision.

The essentials, at a glance.

  • Count additional costs caused by the incident, not the normal cost of running the shift.
  • Keep measured amounts separate from estimates and unpriced consequences.
  • Do not treat the full estimated loss as a saving the software will deliver.

01 · Define the incident

Use one missed start and a clear period.

Choose a specific situation: for example, an opener is missing and another worker arrives later to cover. Record what happened between the planned start and the point when the operation recovered. Include the role, delay and actions taken, without turning an unanswered call into proof of absence.

For a monthly view, use recorded incidents from a stated period. If the number of missed shifts is an assumption rather than an observation, label it as an estimate. One unusually difficult incident should not silently become the expected cost of every missed shift.

02 · Count extra costs

Separate the normal shift from the extra bill.

Consider additional overtime premiums, emergency travel, extra delivery costs or other expenses directly caused by the gap. Use amounts from your own operation. Do not automatically add the full replacement wage if that work would have been paid for anyway.

Manager time can also matter. Record the time spent and decide consistently whether you will assign it a cost. Keep that estimate distinct from a cash expense. Avoid counting the same hour once as staff cost and again inside a broader disruption figure.

Illustrative example — not customer data.

Suppose an incident adds 180 DKK in overtime premium, 120 DKK in extra travel and an estimated 100 DKK of coordination time. The total is 400 DKK, of which 300 DKK is extra expense and 100 DKK is estimated time cost. These invented amounts exclude VAT and are not a typical loss or a promised saving.

03 · Describe disruption

Some consequences need words before numbers.

An opening delay, a late handover or unfinished work can affect people beyond the missing role. Record who had to wait and what was postponed. If you cannot reasonably price the effect, leave it as an operational observation instead of guessing.

Be careful with revenue: a delayed sale is not automatically a lost sale, and revenue is not the same as profit. Keep uncertain effects outside the measured subtotal. A short note explaining what is unknown is more honest than a precise-looking total built from assumptions.

04 · Compare scenarios

Earlier notice is an opportunity, not a refund.

Ask what earlier notice could realistically have changed. Perhaps the manager could have contacted the worker sooner or considered a different plan. Some costs might still have occurred, especially where no suitable cover was available.

On the Pricing page, the optional loss comparison uses your adjustable estimates and compares them with the full monthly ShiftAlert fee. Keep that estimate separate from the actual tariff. The comparison does not predict how many absences will be avoided or what your business will save.

Put it into practice

A useful estimate has a clear basis.

  • The incident and reporting period are stated.
  • Normal shift costs are separated from additional expenses.
  • Time estimates and uncertain effects are labelled.
  • No cost appears twice in the total.
  • Potential savings are not presented as guaranteed results.